Estimate for Cast-In-Situ Pile The diameter of the pilot is 18". A total of 8 16mm diameter rods were used in the pilot from top to bottom. The spiral is done with a 10mm rod. Spiral spacing 4 “C / C on the first L / 4 and the last L / 4. The rest must h

Estimate for Cast-In-Situ Pile The diameter of the pilot is 18". A total of 8 16mm diameter rods were used in the pilot from top to bottom. The spiral is done with a 10mm rod. Spiral spacing 4 “C / C on the first L / 4 and the last L / 4. The rest must hold 6” C / C.
62.0000 rft
Materials for 62 rft
Material Qty Unit Unit Price Amount
18" Boring 62 rft 0.00
Stone 87.65 cft 180.00 15,777.00
Sand FM 2.5 43.82 cft 65.00 2,848.30
Cement 27.66 bag 575.00 15,904.50
reinforce bar or rebar or rod 364 kg 0.00
Grand Total 34,529.80