Analysis of Buggy Road

Analysis of Buggy Road
1.0000 sft
Materials for 1 sft
Material Qty Unit Unit Price Amount
Filling Soil 1.95 cft 0.00
Sand Fiil 6" with 0.5 fm with compaction by 10 tonne roller with full saturated with 98% compaction 0.77 cft 0.00
B. Chips 0.81 cft 110.00 89.10
Sand 1.2 FM 0.6 cft 45.00 27.00
Cement 0.22 bag 575.00 126.50
reinforce bar or rebar or rod 0.36 kg 0.00
Grand Total 242.60